Process Methodology
At Accent, we follow industry standard process methodologies to ensure we meet your expectations throughout the course of your project. We document our activities and continuously enhance our processes as we work alongside your team. As a result, we deliver a quality, cost-effective product designed to meet or exceed your expectations.
Technical Documentation Process
Below is a typical process that we follow when working with our clients:
- Kickoff meeting to gather project details, timeline, resources, materials, budget, and requirements.
- Define and outline project specifications to meet timeline and budget.
- Review existing engineering documents.
- Assign technical writers, technical illustrators, and project managers to the project.
- Identify ideal content management solution and define tools and steps for efficient documentation.
- Develop technical content and graphics/illustrations.
- Assemble and perform internal proofreading/editing.
- Send out draft for client review.
- Final page composition and proofreading/editing.
- Deliver final product.
Application Development Process
Accent's web application development team has consistently delivered projects for clients that observe Capability Maturity Model (CMM) Level 3 and 4 process standards.
Following is the typical process we follow for custom application development:
Plan and Define
- Meet with subject matter experts and business analysts to determine project scope and deliverables.
- Develop a project plan including a schedule and budget.
- Develop use case diagrams.
- Create a mutually agreeable set of business and system requirements.
Design and Build
- Create system design documentation.
- Develop overall software architecture diagram.
- Define any interfaces with other systems that the target application requires.
- Code and configure.
- Conduct unit, integration, and regression testing as required.
Test
- Develop system integration test plan.
- Develop user acceptance test plan.
- Conduct system and end-to-end testing.
- Fix code for formal user acceptance testing.
- Conduct formal user acceptance testing.
- Fix code for final acceptance and deployment.
- Obtain final sign-off for deployment.
Deploy
- Develop deployment scripts and instructions.
- Establish system operations and maintenance plans.
- Deploy to target production system.
- Deliver user guide required for operation of system.
- Evaluate that all project objectives have been met.
Close Project
In order to adhere to and improve upon our quality management standards and those of our industry, Accent Technologies has the proud distinction of being an ISO 9001 certified company. These process standards help us to perform, manage, and ensure quality products and services to our clients. View our ISO 9001 certificate.
Learn about the industries we serve.

